
- Jan 14
Design & Construct Two Pedestrian Footbridges - Paisley Avenue
Paisley Avenue and Balkissoch Road Pedestrian Bridge Replacements Construction of retaining walls & bridges

- Jan 14
Cowell Boat Ramp Upgrade
This project involved: Site Establishment, Preliminaries, New Boat Ramp, Supply and Installation of Boat Launching Pontoons, Installation...

- Jan 14
Mintaro Bridge Replacement
5.5m x 2m Holcim Box Culvert and Insitu Concrete Floor, Earthworks, Pavement, Guardrail and Pedestrian Balustrade

- Jan 14
Mistletoe Torrens Linear Path Upgrade
The scope of works included the rehabilitation and renewal of infrastructure assets associated with Park 11, east of Albert Bridge with...

- Jan 14
Adelaide 500 Track and Civil Works: Recurrent Contract 2002 to 2021.
Civil Tech were proud to perform all of the Track and Civil Works associated with the Adelaide 500. The scope of works included site...

- Jan 14
Redevelopment of Port Hughes Boat Ramp
Civil Tech Pty Ltd were recruited to redevelop the very visually pleasing Port Hughes Boat Ramp. The scope of works included raising of...

- Jan 14
Milang Foreshore Restoration
The project involved a major upgrade of the Milang foreshore, including new paths, shelter structures and a bespoke bird hide, to provide...

- Jan 14
Construction of Coast Park, Point Malcolm Reserve – Bower Road, Semaphore
The Coast Park is a State Government initiative which extends along the Adelaide foreshore from North Haven to Sellicks Beach. This...

- Jan 14
Construction of an Underpass - Seaview Road Bridge, River Torrens
Work involved construction of a dual use pedestrian/bicycle path and walkway along the northern concrete revetment for the River Torrens...

- Sep 13, 2019
Victoria Square - Eastern Footpath Upgrade
Replacement of footpaths and kerbing along eastern side of Victoria Square. Works involved demolition and replacement of 180m of heavy...

- Jul 18, 2019
McHarg Creek Road Culvert Stormwater Upgrade
The scope of works Installation of 13m of new 1.5x1.8m box culvert across McHargs Creek Rd. Works involved demolition of old stone...

- Jul 18, 2019
New Intersection Access, Totness
Construction of Intersection Access into new commercial development located at 22 Mt Barker Road, Totness including Earthworks,...

- Jul 18, 2019
Kays Road McLaren Vale Retaining Wall
Completed in just 7 days, the works involved construction of a 3.5m high mass block retaining wall, adjacent a rural road at McLaren...

- Jul 18, 2019
Copper Coast Highway - Kadina
Copper Coast Highway diversion to create new extension of Kadina CBA. Work done on DPTI road to DPTI standards but financed by Copper...

- Jul 12, 2019
McHarg Creek Road - Culvert Upgrade
Installation of 13m of new 1.5 x 1.8m box culvert across McHargs Creek Rd, at depths of up to 3.3m. Works involved progressive demolition...

- Jul 9, 2019
Middleton Footbridge Construction Works
After a major storm, an existing pedestrian bridge was lost and adjacent banks were severely eroded. Civil Tech installed more than 70m3...

- May 25, 2019
Lansdowne Terrace Stormwater and Road Upgrade
In 2019, Civil Tech completed a major drainage upgrade for Town of Walkerville, involving a new 1.3km trunk main adjacent the River...

- Oct 28, 2018
Northern Connector Pipeline
The scope of works includes procure pipe and complete construction works to upgrade the existing WRSV recycled water pipeline in advance...

- Sep 6, 2018
Victor Turntable Carpark and Landscaping
The scope of works was for the construction of a new carpark, retaining wall and associated works.

- Sep 3, 2018
High Street Carpark, Strathalbyn
New carpark re-construction and line-marking.