VALO Adelaide 500 - That's a Wrap!
We're so proud to have worked with iEDM and the VALO Adelaide500 again this year, helping with track maintenance and civil works.
Dec 15, 2022


Milang Foreshore Restoration
The project involved a major upgrade of the Milang foreshore, including new paths, shelter structures and a bespoke bird hide, to provide...
Jan 14, 2022


Adelaide 500 Track and Civil Works
The scope of works includes site preliminaries and establishment; erection and dismantle of temporary structures including overpass...
May 10, 2018


Stormwater Culvert Repairs
Completed in 2018, the scope of works covered design and construction of repairs and the replacement of existing culverts damaged by...
Apr 23, 2018


Milang Foreshore Restoration
The project involved a major upgrade of the Milang foreshore, including new paths, shelter structures and a bespoke bird hide, to provide...
Feb 12, 2018


Tainmuntilla River Bank Stability - River Torrens
During the winter months, construction of 200m of bank stabilisation on the edge of the River Torrens at Hackney, including reinstatement...
Mar 22, 2017


Stormwater Drainage Construction Water Saving Urban Design (WSUD)
Stormwater Drainage Construction Water Saving Urban Design (WSUD) – Batchelor Reserve, Norseman Avenue, Westbourne Park.
Jan 29, 2014