top of page

River Torrens Seaview Underpass

  • Civil Tech Pty Ltd
  • Nov 20, 2009
  • 1 min read

Updated: Mar 16, 2023


Civil Tech Pty Ltd was responsible for the construction of a dual-use pedestrian/bicycle path and walkway along the northern concrete revetment for the River Torrens channel outlet and approaches to the revetment.

The works included the following:

  • Implementation of appropriate measures to protect existing trees

  • Path removal, and temporary fencing

  • Earthworks to establish path formation

  • Relocation of light pole

  • Localised demolition

  • Supply and installation of new precast walkway and support posts and cross-bracing

  • Supply and install balustrade both sides of walkway

  • Construction of concrete paths

  • Supply and installation of new gabion retaining wall between existing path and new path

  • Line-marking

  • Supply of handrail to new path.

The space designed by Civil Tech Pty Ltd works well, with great pedestrian access.

Comments


White Marble_edited_edited.jpg

Thanks for submitting!

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram
A Family Owned and Operated Business Logo
LGA Procurement Approved Supplier Logo
CCFSA Member Logo

©2025 CIVIL TECH PTY LTD

ABN 41 007 989 433
BLD 186315

bottom of page