Stormwater Culvert Repairs

The scope of works included repairs damaged sections of roads, culverts, and bridges in various locations including infrastructure reinstatement. Gilbert Siding Rd – full replacement of twin cell 1200 dia SW pipes and headwalls at up to 4.0m below finished surface levels, including reinstatement of collapsed unsealed road. Cleland Gully Rd – full replacement of existing 1200 SW culvert, including scour protection measures downstream of the outlet. Works completed while managing active creek flows. Myrtle Gully Rd – Repairs of existing triple cell 900 culvert, and new insitu concrete headwalls Works were completed while managing active creek flows.

Stormwater Culvert Repairs

Completed in 2018, the scope of works covered design and construction of repairs and the replacement of existing culverts damaged by floods in 2016. Gilbert Siding Rd – full replacement of twin cell 1200 dia SW pipes and headwalls up to 4.0m below finished surface levels, including reinstatement of collapsed unsealed road. Cleland Gully Rd – full replacement of existing 1200 SW culvert, including scour protection measures downstream of the outlet. Works completed while managing active creek flows. Myrtle Gully Rd – Repairs of existing triple cell 900 culvert and new insitu concrete headwalls. Peel Rd – upgrade existing floodway to new twin 1200x600 RCBC crossing

Harry Wauer Memorial Award Winner

Civil Tech Pty Ltd is proud to announce one of its own, Mark Trost as winner of the CCF’s 2018 Trainee of the Year and prestigious “Harry Wauer Memorial Award”. Congratulations Mark, we are so proud of you and your achievements!

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Twitter - Black Circle
  • Instagram - Black Circle
  • Facebook - Black Circle

©2020 BY CIVIL TECH PTY LTD.