CCF Earth Awards Category One Winner 2018

Civil Tech Pty Ltd is a proud winner of the CCF Earth Awards Category One Winner 2018 for the St Peters & Gilberton Swing Bridge Refurbishment. If you would like to see a short video of our winning project, please click here.

Cleland Gully Road, Tooperang Stormwater Upgrade

The scope of work involved replacement of a failed 900RCP with new 1200 RCP at invert depth of up to 4m. Challenges included soft sand soils, careful staging to ensure road was kept open, and managing continuous creek flows while the culvert was being replaced. As part of the scope, Civil Tech also reconstructed around 200m2 of pavement that had experienced regular slip failures in the past. The existing pavement was excavated to 1.3m deep, heavy rock punched to stabilize a soft boggy, subgrade, then full 1.0m depth of mesh stabilized pavement was constructed and resealed.

Storm Damage Repairs, Strathalbyn

The scope of work included repairs to scour damage at an existing floodway at Strathalbyn. A 3m baboon wall was installed, along with repairs to existing concrete wing walls. Civil Tech offered a number of technical improvements to initial design allowing the budget to extend to completing a link path to existing network and providing a better outcome for the community.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Twitter - Black Circle
  • Instagram - Black Circle
  • Facebook - Black Circle

©2020 BY CIVIL TECH PTY LTD.