July 9, 2019

After a major storm, an existing pedestrian bridge was lost and adjacent banks were severely eroded.  Civil Tech installed more than 70m3 of gabion baskets and new abutments, and assembled and installed a new Landmark bridge. Challenges included an exceptional high wat...

May 16, 2018

The scope of work included setting out the works from established bench marks and boundaries; demolition of the existing bridge, construction of a new road bridge, construction of a new footbridge; construction of road pavement, construction of bridge barriers and boll...

January 31, 2018

Working in partnership with the Council, heritage advisor and engineering consultants OPUS, Civil Tech Pty Ltd undertook the replacement of the 55m long heritage listed swing bridge in late 2017. The existing plywood and steel bridge was carefully demolished and replac...

November 30, 2017

The scope of works for the Carnegie and Victoria Drive Footbridges comprised of the design, supply and installation of two clear span steel pedestrian bridges being a minimum of 2.5m wide.  The civil works component included associated path linkages and abutments inclu...

December 18, 2015

Civil Tech Pty Ltd undertook earthworks, boardwalk construction, and concrete finishes and landscape components to complete the Linear Path Upgrade in Christies Creek.

Civil Tech Pty Ltd's personnel are respectful of the environment and surrounding areas.  The local com...