May 25, 2019

In 2019, Civil Tech completed a major drainage upgrade for Town of Walkerville, involving a new 1.3km trunk main adjacent the River Torrens to Ascot Ave near North East Rd. The main components of approximately 500m of 1200 RCP at depths of up to 3.9m, steadily reducing...

September 3, 2018

New carpark re-construction and line-marking. 

August 10, 2018

The scope of work involved replacement of a failed 900RCP with new 1200 RCP at invert depth of up to 4m. Challenges included soft sand soils, careful staging to ensure road was kept open, and managing continuous creek flows while the culvert was being replaced. 

As part...

August 10, 2018

The scope of work included repairs to scour damage at an existing floodway at Strathalbyn. A 3m baboon wall was installed, along with repairs to existing concrete wing walls. Civil Tech offered a number of technical improvements to initial design allowing the budget to...

Please reload

Featured Posts

Cleland Gully Road, Tooperang Stormwater Upgrade

August 10, 2018

1/5
Please reload

Recent Posts
Please reload

Archive