Grange Lakes Shared Use Path Boardwalk Construction


Civil Tech Pty Ltd was responsible for the supply, fabrication andconstruction of a boardwalk shared use path structure along the section of the Grange Lakes channel between Fort Street and McLean Street.


The structure is capable of supporting a uniformly distributed load of 5kPa.


The scope of work included site preparation, demolition and removal, supplyof materials, fabrication, delivery to and storage at site, construction including all footing, concrete, steelwork, laying, excavation, bedding and backfilling of footings etc, protective coating, electrical works, testing, inspection andcommission.


This job also was winnerof the 2017 SA Walking Award.