- Jan 14
Design & Construct Two Pedestrian Footbridges - Paisley Avenue
Paisley Avenue and Balkissoch Road Pedestrian Bridge Replacements Construction of retaining walls & bridges

- Jan 14
Cowell Boat Ramp Upgrade
This project involved: Site Establishment, Preliminaries, New Boat Ramp, Supply and Installation of Boat Launching Pontoons, Installation...

- Jan 14
Mintaro Bridge Replacement
5.5m x 2m Holcim Box Culvert and Insitu Concrete Floor, Earthworks, Pavement, Guardrail and Pedestrian Balustrade

- Sep 13, 2019
Victoria Square - Eastern Footpath Upgrade
Replacement of footpaths and kerbing along eastern side of Victoria Square. Works involved demolition and replacement of 180m of heavy...

- Jul 18, 2019
McHarg Creek Road Culvert Stormwater Upgrade
The scope of works Installation of 13m of new 1.5x1.8m box culvert across McHargs Creek Rd. Works involved demolition of old stone...

- Jul 18, 2019
New Intersection Access, Totness
Construction of Intersection Access into new commercial development located at 22 Mt Barker Road, Totness including Earthworks,...

- Jul 18, 2019
Kays Road McLaren Vale Retaining Wall
Completed in just 7 days, the works involved construction of a 3.5m high mass block retaining wall, adjacent a rural road at McLaren...

- Jul 18, 2019
Copper Coast Highway - Kadina
Copper Coast Highway diversion to create new extension of Kadina CBA. Work done on DPTI road to DPTI standards but financed by Copper...

- Jul 9, 2019
Middleton Footbridge Construction Works
After a major storm, an existing pedestrian bridge was lost and adjacent banks were severely eroded. Civil Tech installed more than 70m3...

- Oct 28, 2018
Northern Connector Pipeline
The scope of works includes procure pipe and complete construction works to upgrade the existing WRSV recycled water pipeline in advance...

- Sep 6, 2018
Victor Turntable Carpark and Landscaping
The scope of works was for the construction of a new carpark, retaining wall and associated works.

- Jul 31, 2018
Lansdowne Terrace Stormwater and Road Upgrade
Stage 1 – Lansdowne Terrace (Linear Park to Vale St) The main components of around 400m of 1200 and 1050 RCP at depths of up to 3.9m....

- May 16, 2018
Construction of Memorial Park Bridge
The scope of work included setting out the works from established bench marks and boundaries; demolition of the existing bridge,...

- Apr 27, 2018
Stormwater Culvert Repairs
The scope of works included repairs damaged sections of roads, culverts, and bridges in various locations including infrastructure...

- Jul 13, 2017
Drainage Channel Upgrade
Drainage upgrade in Yandra Terraace, Hayborough including earthworks, installation of drainage pipes, pits, box culverts, GPT, SA Water...

- Mar 22, 2017
Tainmuntilla River Bank Stability - River Torrens
During the winter months, construction of 200m of bank stabilisation on the edge of the River Torrens at Hackney, including reinstatement...

- Dec 18, 2015
Christies Creek Morphett Vale Linear Path Upgrade
Civil Tech Pty Ltd undertook earthworks, boardwalk construction, and concrete finishes and landscape components to complete the Linear...

- Jun 17, 2015
Grange Lakes Shared Use Path Boardwalk Construction
Civil Tech Pty Ltd was responsible for the supply, fabrication and construction of a boardwalk shared use path structure along the...

- Sep 26, 2014
Agnes Water Desalination Plant
Design/Construct Pump Well and Inlet and Outlet Structure for Desalination Plant. Excavation 12m deep shaft in concrete works for intake...

- Jan 28, 2014
Stormwater Drainage Construction WSUD
Stormwater Drainage Construction Water Saving Urban Design (WSUD) – Batchelor Reserve, Norseman Avenue, Westbourne Park.