Completed in 2018, the scope of works covered design and construction of repairs and the replacement of existing culverts damaged by floods in 2016.
Gilbert Siding Rd – full replacement of twin cell 1200 dia SW pipes and headwalls up to 4.0m below finished surface levels, including reinstatement of collapsed unsealed road.
Cleland Gully Rd – full replacement of existing 1200 SW culvert, including scour protection measures downstream of the outlet. Works completed while managing active creek flows.
Myrtle Gully Rd – Repairs of existing triple cell 900 culvert and new insitu concrete headwalls.
Peel Rd – upgrade existing floodway to new twin 1200x600 RCBC crossing