The scope of work included repairs to scour damage at an existing floodway at Strathalbyn. A 3m baboon wall was installed, along with repairs to existing concrete wing walls. Civil Tech offered a number of technical improvements to initial design allowing the budget to extend to completing a link path to existing network and providing a better outcome for the community.