September 13, 2019

Replacement of footpaths and kerbing along eastern side of Victoria Square. 

Works involved demolition and replacement of 180m of heavy reinforced kerb, with deep lift asphalt reinstatement;  12 replacement pram ramps up to 1800mm wide;  around 900m2 of 900x600x80mm con...

July 18, 2019

The scope of works Installation of 13m of new 1.5x1.8m box culvert across McHargs Creek Rd. Works involved demolition of old stone culvert, while protecting 2 very old elm trees in close proximity to the works. Council stipulated the road must be kept open at all times...

July 18, 2019

Construction of Intersection Access into new commercial development located at 22 Mt Barker Road, Totness including Earthworks, Roadworks, Kerbing, Traffic Signage and Stormwater. 

Work done on DPTI road to DPTI standards.

July 18, 2019

Completed in just 7 days, the works involved construction of a 3.5m high mass block retaining wall, adjacent a rural road at McLaren Vale. Works involved placed of new SW pipes, insitu concrete blocks, and then placement of 33 blocks, and associated erosion control wor...

July 18, 2019

Copper Coast Highway diversion to create new extension of Kadina CBA. 

Work done on DPTI road to DPTI standards but financed by Copper Coast Council.

Length of highway diverted 540 metres, including lighting, drainage and mounding.

July 12, 2019

Installation of 13m of new 1.5 x 1.8m box culvert across McHargs Creek Rd, at depths of up to 3.3m. Works involved progressive demolition of old stone and timber culvert, while protecting 2 mature elm trees in close proximity to the works. Council also stipulated the n...

July 9, 2019

After a major storm, an existing pedestrian bridge was lost and adjacent banks were severely eroded.  Civil Tech installed more than 70m3 of gabion baskets and new abutments, and assembled and installed a new Landmark bridge. Challenges included an exceptional high wat...

May 25, 2019

In 2019, Civil Tech completed a major drainage upgrade for Town of Walkerville, involving a new 1.3km trunk main adjacent the River Torrens to Ascot Ave near North East Rd. The main components of approximately 500m of 1200 RCP at depths of up to 3.9m, steadily reducing...

October 28, 2018

The scope of works includes procure pipe and complete construction works to upgrade the existing WRSV recycled water pipeline in advance of the Northern Connector roadway construction including the supply, fabrication, delivery, handling, hauling, unloading and receivi...

September 6, 2018

The scope of works was for the construction of a new carpark, retaining wall and associated works.