Lansdowne Terrace Stormwater and Road Upgrade
- Civil Tech Pty Ltd
- Jul 31, 2018
- 1 min read
Updated: Dec 20, 2021

Stage 1 – Lansdowne Terrace (Linear Park to Vale St)
The main components of around 400m of 1200 and 1050 RCP at depths of up to 3.9m. Works required construction of both large insitu and precast junction boxes up to 4.0m deep, as well as cross connections, side entry pits and grated inlet pits. Finishing works included new kerbing where required, 3 fully lined rain gardens, and reseal of the road.