Kays Road McLaren Vale Retaining Wall
Completed in just 7 days, the works involved construction of a 3.5m high mass block retaining wall, adjacent a rural road at McLaren...
Jul 18, 2019


Copper Coast Highway - Kadina
Copper Coast Highway diversion to create new extension of Kadina CBA. Work done on DPTI road to DPTI standards but financed by Copper...
Jul 18, 2019


Middleton Footbridge Construction Works
After a major storm, an existing pedestrian bridge was lost and adjacent banks were severely eroded. Civil Tech installed more than 70m3...
Jul 9, 2019


Northern Connector Pipeline
The scope of works includes procure pipe and complete construction works to upgrade the existing WRSV recycled water pipeline in advance...
Oct 28, 2018


Victor Turntable Carpark and Landscaping
The scope of works was for the construction of a new carpark, retaining wall and associated works.
Sep 6, 2018


Lansdowne Terrace Stormwater and Road Upgrade
Stage 1 – Lansdowne Terrace (Linear Park to Vale St) The main components of around 400m of 1200 and 1050 RCP at depths of up to 3.9m....
Jul 31, 2018


Construction of Memorial Park Bridge
The scope of work included setting out the works from established bench marks and boundaries; demolition of the existing bridge,...
May 16, 2018


Adelaide 500 Track and Civil Works
The scope of works includes site preliminaries and establishment; erection and dismantle of temporary structures including overpass...
May 10, 2018


Stormwater Culvert Repairs
The scope of works included repairs damaged sections of roads, culverts, and bridges in various locations including infrastructure...
Apr 27, 2018


Stormwater Culvert Repairs
Completed in 2018, the scope of works covered design and construction of repairs and the replacement of existing culverts damaged by...
Apr 23, 2018


Harry Wauer Memorial Award Winner
Civil Tech Pty Ltd is proud to announce one of its own, Mark Trost as winner of the CCF’s 2018 Trainee of the Year and prestigious “Harry...
Apr 6, 2018


Milang Foreshore Restoration
The project involved a major upgrade of the Milang foreshore, including new paths, shelter structures and a bespoke bird hide, to provide...
Feb 12, 2018


Gilberton Swing Bridge
Working in partnership with the Council, heritage advisor and engineering consultants OPUS, Civil Tech Pty Ltd undertook the replacement...
Jan 31, 2018


Minlaton Stage 2 PLEC
Civil construction works included the removal of overhead powerlines in the Minlaton main street. Scope covered more than 800m of...
Jan 11, 2018


Mawson Lakes Footbridges
The scope of works for the Carnegie and Victoria Drive Footbridges comprised of the design, supply and installation of two clear span...
Nov 30, 2017


Goolwa Terrace Traffic Management and Streetscape Upgrade
The Cadell Street Upgrade is a road intersection reconstruction, public carpark construction, and streetscape beautification project. The...
Oct 27, 2017


Redevelopment of the Port Hughes Boat Ramp
Civil Tech Pty Ltd redevelop the very visually pleasing Port Hughes Boat Ramp. The scope of works included a new launching area, rock...
Sep 14, 2017


Drainage Channel Upgrade
Drainage upgrade in Yandra Terraace, Hayborough including earthworks, installation of drainage pipes, pits, box culverts, GPT, SA Water...
Jul 13, 2017


Streetscape Upgrade - Prospect Road - Way Street to Grand Junction Road, Kilburn
The scope of works consisted of the following key elements but not limited to site establishment, demolition, paving, landscaping,...
Jun 30, 2017


Tainmuntilla River Bank Stability - River Torrens
During the winter months, construction of 200m of bank stabilisation on the edge of the River Torrens at Hackney, including reinstatement...
Mar 22, 2017